A healthy utilization rate for a marketing agency typically sits between 65% and 85% of available hours spent on billable work, depending on the role. Senior leaders run much lower, while delivery staff run higher. For a healthcare communications agency or MedComms agency, the right target also leaves room for review cycles, medical accuracy checks, and training.
The best figure is the one that keeps margins healthy without burning out the team or leaving no slack for new business. The sections below explain why targets vary, how to calculate the figure, the risks of pushing too high, and how sound agency capacity planning keeps utilization steady when demand shifts.
Why do utilization targets differ by role?
Utilization targets differ by role because each position carries a different share of non-billable responsibility. A medical writer spends most of the week on client deliverables, while an agency director spends much of it on pitching, hiring, and management. Setting one target for everyone would overstate what leaders can bill and understate what delivery teams can.
As a practical guide, many agencies set targets along these lines, then adjust for their own model:
- Medical writers, copywriters, and designers: roughly 75% to 85%, since most of their time is project work.
- Editorial and QC specialists: roughly 70% to 80%, with time reserved for checks that rarely appear on a timesheet.
- Account and project managers: roughly 60% to 75%, because coordination, client calls, and internal planning are only partly billable.
- Directors and senior leaders: often 30% to 50%, reflecting new business, strategy, and people management.
These ranges are starting points, not industry standards. Agencies that rely heavily on scientific accuracy and multi-stage approval, as many MedComms agencies do, often need more buffer for review loops than a general creative shop. The key is to set targets by role, test them against real timesheets, and revisit them as the work mix changes.
How do you calculate utilization rate accurately?
Utilization rate is calculated by dividing billable hours by total available hours, then multiplying by 100. If a writer logs 120 billable hours in a month with 160 available hours, utilization is 75%. Accuracy depends on defining “available hours” consistently, because that denominator is where most errors creep in.
To keep the calculation reliable, follow these steps:
- Set a clear denominator. Decide whether available hours means contracted hours, or contracted hours minus holidays and approved leave. The second option gives a fairer picture of real capacity.
- Define billable work. Agree what counts, such as client deliverables and billable meetings, and what does not, such as internal training or pitching.
- Track time consistently. Weekly timesheet completion produces better data than monthly reconstruction from memory.
- Separate billable from productive. Pitch work and training are valuable but non-billable. Tracking them separately shows where time actually goes.
- Compare against budgeted hours. Looking at actual versus planned hours on each project reveals scoping problems that distort utilization.
Calculate the figure at individual, team, and agency level. A healthy agency average can hide one overloaded writer and one underused designer, so the breakdown matters as much as the headline number.
What are the risks of utilization that is too high?
Utilization that runs too high puts quality, people, and growth at risk. Teams at or above 90% have no slack to absorb a late client review, a revised brief, or a sick colleague, so small disruptions become missed deadlines. In medical and scientific work, rushed review also raises the chance of errors that damage client trust.
The main risks include:
- Burnout and attrition: sustained overload pushes experienced people out, and replacing them costs far more than the margin the extra hours produced.
- Quality slippage: less time for editorial checks, reference verification, and compliance review increases rework.
- No capacity for new business: a fully booked team cannot say yes to a new pitch or account without displacing existing work.
- Reduced development: training, mentoring, and process improvement are the first things to disappear when every hour is billable.
Utilization that is too low carries its own problem, since idle capacity erodes margin. The aim is a sustainable band, not the highest possible number. If a team sits above its target for several weeks running, treat it as an early warning rather than a sign of efficiency.
How can agencies adjust utilization when demand fluctuates?
Agencies adjust utilization when demand fluctuates by flexing capacity rather than forcing a fixed team to absorb every swing. The main levers are forward resource planning, reallocating work internally, and bringing in specialist freelance support during peaks. This keeps core staff within their target range and protects delivery quality.
Effective agency capacity planning usually combines several approaches:
- Look ahead, not just back. Map confirmed projects, likely pitches, and known deadlines against available hours for the next eight to twelve weeks, so gaps appear before they become crises.
- Balance across the team. Move work from overloaded people to those with slack, matching skills as closely as possible.
- Scope and schedule realistically. Build review time and client turnaround into plans so projects do not compress at the end.
- Use freelancers for peaks and gaps. When several deadlines converge or a specific therapy area or format needs expertise the team lacks, vetted freelance specialists add capacity without permanent headcount.
- Protect slow periods. When demand dips, use the time for training, process work, and business development rather than letting it go unplanned.
Freelancers work best when they are briefed well and fit the team’s processes. Agencies that already have trusted freelance relationships can extend that network when a regular freelancer is booked or when several projects overlap, so they can accept new work with confidence.
How often should agencies review utilization rates?
Agencies should review utilization weekly at team level and monthly at agency level, with a deeper quarterly reassessment of targets. Weekly checks catch overload early, monthly reviews show trends and profitability, and quarterly reviews confirm that role targets still match the work the agency actually wins and delivers.
A simple review rhythm looks like this:
- Weekly: resource managers and project leads check upcoming workload against capacity, and flag anyone trending above target.
- Monthly: leadership reviews utilization by role alongside project margins, to see whether high utilization is actually producing profit.
- Quarterly: revisit the targets themselves. A change in service mix, a new major account, or a shift in team size can make last year’s targets unrealistic.
- After major events: review after a large pitch win or loss, since either can change capacity needs quickly.
Pair the numbers with conversation. Timesheets show hours, but only the team can explain why a project overran or why a role feels stretched. Reviewing both gives a more honest picture than data alone.
How Talus helps with agency capacity planning
Talus is the specialist freelance network for healthcare communications, helping MedComms agencies add vetted expertise when workloads change, so core teams stay within a healthy utilization range. It extends an agency’s existing freelance relationships rather than replacing them.
- Vetted specialists: freelancers have at least two years of in-house agency or pharma experience and two endorsements, covering medical writing, editorial and QC, design, and project management.
- Search by fit: filter by expertise, project type, and therapy area, or ask the Talus team to help identify suitable options.
- Support for peaks and planned cover: use it for urgent briefs, overlapping projects, or ongoing support, with availability checked as requirements arise.
- Simpler admin: briefing, contracts, hours, and invoicing sit in one platform, with batch invoicing of no more than two invoices per month.
- Transparent rates: clear hourly rates mean agencies know the cost of a job upfront.
If your team is regularly stretched past its target utilization, explore the specialists on Talus or share a brief with the team to check fit and availability.
Related Articles
- How do you plan agency capacity for seasonal client demand?
- Is agency capacity planning different for design and development teams?
- What Should Agencies Look for in a Freelance Publication Planning Specialist?
- How Can Healthcare Communications Agencies Find Freelancers Beyond Their Existing Network?
- How Can Healthcare Communications Agencies Use Freelancers Without Compromising Quality?