Should agencies plan capacity by hours or by project deliverables?

Sameer ยท

Healthcare communications agencies should plan capacity by deliverables as the primary model and use hours as the underlying measure of effort. Deliverables tie resourcing to what clients actually buy, while hours convert that scope into capacity you can schedule. Agencies that rely on hours alone tend to miss variation in complexity, review cycles and specialist requirements.
The right balance depends on how variable the workload is and how much specialist experience each piece of work needs. The sections below cover where hours-based planning falls short, what deliverable-based planning involves, and how to combine both with freelance cover.

Where does hours-based capacity planning break down?

Hours-based capacity planning breaks down when the effort behind a task varies more than the hours assigned to it. Two manuscripts or two congress posters can consume very different amounts of time depending on data complexity, author responsiveness and review rounds. A plan that treats every hour as equal hides those differences.
Several weaknesses appear repeatedly in MedComms agencies:

  • Hours are not interchangeable. Forty hours of senior medical writing is not the same capacity as forty hours of general editorial support. A plan that counts only hours can show spare capacity while the specialist experience a brief needs is fully booked.
  • Estimates drift. Scope changes, late data and extra client review rounds consume hours that were never budgeted, so plans become inaccurate within weeks.
  • Overlapping deadlines are invisible. Hours spread evenly across a month can look manageable even when three submissions land in the same week.
  • Utilisation becomes the goal. When the plan rewards filled hours, teams can lose sight of whether the work is progressing toward a deliverable on time.

Hours still matter. They are the unit that finance, resourcing and freelancers all understand. The problem arises when hours are the only lens used to judge whether the agency can take on more work.

What does deliverable-based capacity planning look like in MedComms?

Deliverable-based capacity planning starts with the outputs an agency must produce, such as manuscripts, slide decks, congress materials or storyboards, then estimates the effort, skills and timeline each one needs. Capacity is expressed as how many deliverables of each type the team can complete within a given period.
In practice, this approach usually involves four steps:

  1. Define standard deliverable types. Group work into categories such as primary manuscripts, abstracts, posters, advisory board reports and creative assets.
  2. Estimate effort by complexity. Assign a typical effort range to each type, with adjustments for therapy area complexity, data volume and number of authors.
  3. Map the skills required. Note whether each deliverable needs medical writing, editorial and quality control, design, or project management input, and at what seniority.
  4. Schedule against milestones. Place draft, review and final dates on a shared timeline so that peaks in demand are visible early.

The strength of this model is that it mirrors how clients think and how scopes are sold. A project director can see that four publications are due in the same quarter and ask whether the team has the right writers and editors, rather than simply whether there are enough hours. Its weakness is that it needs good historical data on how long each deliverable type really takes, and that data takes time to build.

Which model is better for variable project workloads?

Deliverable-based planning is generally better for variable workloads because it shows when demand shifts in type and timing, not only in total volume. It highlights skill gaps and deadline clusters that an hours total conceals. Hours remain useful as the conversion layer that turns deliverables into schedulable effort.
Several factors should guide the choice:

  • Workload volatility. Agencies with steady retainers can manage well with hours. Agencies with fluctuating pitches, congress seasons and publication peaks benefit from seeing demand by deliverable.
  • Specialist mix. The more disciplines involved, the less useful a single hours figure becomes.
  • Quality of historical data. If the agency has reliable records of past effort per deliverable, deliverable planning becomes accurate quickly. If not, hours tracking is the practical starting point.
  • Commercial model. Fixed-fee scopes align naturally with deliverables. Time-and-materials work aligns more naturally with hours.

For most healthcare communications agencies, the answer is therefore not either/or. The more variable and specialist the work, the more weight deliverables should carry.

Can agencies combine hours and deliverables in one capacity plan?

Yes. Agencies can combine both by using deliverables to define demand and hours to measure the effort needed to meet it. Each deliverable carries an estimated hour range by role, so one plan shows both what is due and who has the time and skills to produce it.
A workable hybrid plan typically includes:

  • A deliverables calendar showing every output, its owner and its key milestones.
  • Effort estimates in hours for each role on each deliverable, such as writer, editor, designer and project manager.
  • A capacity view by role, comparing total demanded hours with available hours each week.
  • A buffer for review cycles, scope changes and unplanned briefs.

This structure lets a resource manager answer two questions at once: whether the team can deliver everything on the calendar, and which discipline will run short first. It also gives account teams a clearer basis for saying yes or no to a new brief, because they can see what it would displace.
Review the estimates regularly. Comparing planned and actual effort after each project steadily improves accuracy and makes the next plan more reliable.

How should freelance cover be planned within either model?

Freelance cover should be planned by identifying the roles and experience a future gap will need, then building relationships and checking availability before the pressure arrives. Whether the plan is built on hours or deliverables, the useful question is which capability is missing from the team for a given brief.
Practical ways to build freelance cover into the plan include:

  • Set a trigger point. Decide in advance the capacity threshold, by role, at which the agency looks beyond its permanent team.
  • Plan by discipline, not just headcount. Note where gaps are likely, such as publications writing, quality control or design, and the therapy area experience each would need.
  • Keep regular freelancers in view. Established relationships remain valuable. Plan for the moments when a regular freelancer is booked, a specialist gap appears or several projects overlap.
  • Brief clearly. A defined brief with deliverables, timing and expected commitment makes it faster to assess fit and confirm availability.
  • Confirm availability, never assume it. Early conversations improve planning, but a specialist is only committed once an engagement is agreed.

Deliverable-based plans make this easier because they show which type of expertise a future gap needs, rather than just how many hours are missing.

How Talus helps with agency capacity planning

Talus is the specialist freelance network for healthcare communications, helping agencies extend their trusted freelance networks when workloads shift or a brief needs capability the team does not have in house. It supports the practical side of acting on a capacity plan:

  • Search endorsed freelance specialists across medical writing, copywriting and publications, editorial and QC, design and creative, and project management.
  • Filter by expertise, project type and therapy area to match experience to the specific deliverable.
  • Manage briefing, contracts, hours and invoicing in one platform, with a batch invoice system that limits agencies to a maximum of two invoices per month.
  • Search directly or ask the Talus team to help identify suitable options.
  • Join and search without a subscription, with agencies paying only when they engage a freelancer.

If your capacity plan shows a gap in a specific role or specialism, share the brief, timing and experience required, and Talus can help you check fit and availability for your upcoming work.